Consulting and mentoring
A second opinion before you commit, and technical mentoring while you build: architecture, ERP selection and reviewing software quotes.

Which decisions?
- ERP selection: Odoo, ERPNext, or keeping today's system and connecting it?
- Build or buy: stay on a hosted commerce platform, or move to your own stack?
- Architecture review: why is the current system slow or fragile, and where should it grow from?
- Weighing quotes: what the software proposals on your desk cover, and what they leave out.
Because we build and run them
Most consulting pages compare systems their authors have never run. Our advice comes from systems we built and that run today. Two examples from the bearing project:
- A second store, not a second ERP. When maintenance products needed a store of their own, we did not set up a second ERP or order system. The second storefront shares the same commerce core and the same ERP; only the storefront and its categories are its own. Read the case study.
- A lab before production. Trying new search or design ideas directly on the live store puts real customers at risk. We built a storefront on the same data but separate from production; what works there moves to the live stores. Read the case study.
In both cases, a problem that looked like it needed more systems was solved with fewer.
Odoo or ERPNext?
Both are open source and both can do the job. For a business in Türkiye, these questions usually decide it:
| Question | Why it matters |
|---|---|
| How will it talk to your e-invoice provider? | Odoo's Turkish localization ships official Nilvera modules; others need checking. |
| Who will run it? | Odoo skills are easier to find in Türkiye. |
| Which modules do you need? | They decide license and hosting cost. |
| How will it connect to your store? | A ready connector, or a custom integration? |
| Who develops it after us? | Ownership and documentation of custom modules. |
We compare them on your processes, by running one of your real days in both systems.
Technical mentoring
Sometimes what is missing is not a decision but a team that is used to carrying it out. We meet weekly with teams moving to an ERP, a new e-commerce stack or a tool such as Next.js, and read their code and setups with them. The aim is not to do the work for them, but for them to do it without us a few months later.
- A weekly or fortnightly session, on your own code and systems
- Code reviews and written answers to architecture questions
- A roadmap for new developers showing which topics to start with
How we work
- Reading. We go through your current systems, documents and any quotes you have.
- Interviews. We talk to the people who use the system every day; the process a manager describes and the one on the floor are often not the same.
- Options. Two or three realistic paths, side by side on cost, time and risk.
- A written recommendation. Which path we recommend, why, and what the first step is.
What you get
- A one-page summary of where you stand
- A comparison of the options on cost, time and risk
- A reasoned recommendation and first steps
- If you want, a technical scope for the team that will carry it out
Services in this area
Notes on the subject

How do you run acceptance testing on a software project?
What to try before you accept commissioned software. Acceptance criteria, real scenarios, a defect list, a test environment and tying payment to acceptance.
· 5 min read

What should you check before hiring a developer for your project?
Before you hand a big project to one developer, find out what they can do, how much industry knowledge the job needs and how you will talk to each other.
· 4 min read

Which ERP should you choose? How to decide between Logo, Mikro, Odoo and ERPNext
A local ERP or an open source one? What Logo, Mikro, Odoo and ERPNext offer, and why you should write down how your business works before you pick any of them.
· 5 min read

How do you compare software proposals from different companies?
Beyond price, what to look at when you collect quotes for software. Timeline, the firm's track record, whether they understand you and the benefit you will get.
· 4 min read

Whose name should the source code and the domain be in, and what should the contract say?
The code of software you paid for does not become yours by itself. What Turkey's copyright law says and which clauses the contract needs.
· 3 min read